five

GroMoPo Metadata for Punjab Indus Basin model

收藏
DataONE2026-03-09 更新2026-03-21 收录
下载链接:
https://search.dataone.org/view/sha256:1945473767cf8beb5b86bb98748728ec60d73ac59a2682b662d2f85c33f84367
下载链接
链接失效反馈
官方服务:
资源简介:
Rapid changes in the irrigated system due to climate change and drastic growth in urbanization and industrialization have raised serious concerns related to available groundwater resources of the Indus basin on which millions of people depend upon for their sustenance. Under the prevailing scenario, three-dimensional numerical groundwater flow model Visual MODFLOW has been used to evaluate the regional groundwater flow from the steady-state period of 1987 (used as a base to run the model for several simulation periods) up to the predictive period of 2030 for sustainable water resource management in the Indus plain of Pakistan. The steady-state calibration of the model indicated a close agreement between the simulated and the observed heads as indicative from the residual mean value of 0.10 m and an absolute residual mean of 0.47 m. The velocity vectors of the groundwater flow indicate that in most parts of the study area groundwater is discharged into the Jhelum and Chenab rivers. In the transient-state condition, groundwater levels indicated a rising trend till 1989, but as the irrigated area tends to increase continuously, the heads started to drop from year 1991 onward at an average rate of 0.45 m/year. The Bari Doab in the south appears to be more under stress than the Rechna and the Lower Chaj Doabs because of the overexploitation of groundwater, low flows in the Ravi River and less recharge from rainfall. The negative impacts of environment changes on the underlying aquifer could be minimized through long-term monitoring of the groundwater system and adoption of integrated water resource management approach in future.
创建时间:
2026-03-14
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作