Bridge Deck Construction Time-Lapse
收藏DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2277/1
下载链接
链接失效反馈官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=LUF-BU55k1Y)]]</p>
<p>The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. This video shows the 1-month process of constructing a concrete bridge deck.</p>
<p>The project is located at <a href="https://www.google.com/maps/@39.9336668,-86.1575314,18.9z">39.9336668,-86.1575314</a>.</p>
提供机构:
Purdue University Research Repository
创建时间:
2016-11-18



