Bridge Deck Construction Time-Lapse
收藏官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=LUF-BU55k1Y)]]</p> <p>The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. This video shows the 1-month process of constructing a concrete bridge deck.</p> <p>The project is located at <a href="https://www.google.com/maps/@39.9336668,-86.1575314,18.9z">39.9336668,-86.1575314</a>.</p>
创建时间:
2016-11-18



