Historic England Heritage at Risk Register 2023
收藏资源简介:
Heritage at Risk provides an understanding of the overall state of England’s heritage assets. Every year Historic England updates the Heritage at Risk Register. The end result is a dynamic picture of the sites most at risk and most in need of safeguarding for the future. Assets may be assessed by using multiple methodologies so may appear multiple times. For example, a scheduled monument could be made up of archaeological remains and a standing structure. In this instance, the remains would be assessed using the archaeological risk assessment, and the structure using the buildings or structures assessment. Conservation Area information is not complete due to availability of Conservation Area spatial data. This data and its spatial depictions are purely indicative and are not a definitive representation. Users are advised to seek clarification and confirmation on risk assessments from Historic England.
《濒危遗产》(Heritage at Risk)项目旨在全面呈现英格兰遗产资产的整体状况。每年,英格兰历史建筑暨遗产委员会(Historic England)都会更新《濒危遗产名录》(Heritage at Risk Register)。最终形成的动态监测图景,可直观展现当前风险等级最高、最亟需开展未来保护工作的遗产地现状。同一项遗产资产可能采用多种评估方法开展评价,因此可能在名录中多次出现。例如,一处法定古迹(scheduled monument)可能同时包含考古遗迹与现存建筑本体,此种情形下,考古遗迹部分将采用考古风险评估方法开展评价,建筑本体则采用建筑或构筑物风险评估方法。受限于保护区(Conservation Area)空间数据的可获取性,保护区相关信息尚未完全完备。本数据集及其空间呈现内容仅为示意性参考,并非官方权威定论。建议用户向英格兰历史建筑暨遗产委员会咨询并确认风险评估的相关细节。



