five

Multi-agent-based proactive–reactive scheduling for a job shop

收藏
DataCite Commons2025-11-20 更新2026-02-08 收录
下载链接:
https://borealisdata.ca/citation?persistentId=doi:10.5683/SP3/VQMBQ4
下载链接
链接失效反馈
官方服务:
资源简介:
Multi-agent-based proactive–reactive scheduling for job shops is presented, aiming to hedge against the uncertainties of dynamic manufacturing environments. This scheduling mechanism consists of two stages, including proactive scheduling stage and reactive scheduling stage. In the proactive scheduling stage, the objective is to generate a robust predictive schedule against known uncertainties; in the reactive scheduling stage, the objective is to dynamically rectify the predictive schedule to adapt to unknown uncertainties, viz. the reactive scheduling stage is actually complementary to the proactive scheduling stage. A stochastic model is presented, which concerns uncertain processing times in proactive scheduling stage on the basis of analyzing the deficiencies of a classical scheduling model for a production schedule in practice. For the stochastic scheduling problem, a multi-agent-based architecture is proposed and a distributed scheduling algorithm is used to solve this stochastic problem. Finally, the repair strategies are introduced to maintain the original proactive schedule when unexpected events occur. Case study examples show that this scheduling mechanism generates more robust schedules than the classical scheduling mechanism.
提供机构:
Borealis
创建时间:
2025-10-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作