遇见数据集

Data for: INCREMENTAL PROCEDURE METHOD FOR THE ANALYSIS OF GROUND REACTION DUE TO EXCAVATION OF A CIRCULAR TUNNEL BY CONSIDERING THE EFFECT OF OVERBURDEN DEPTH

收藏
NIAID Data Ecosystem2026-03-11 收录
官方服务:

资源简介:

In this article, one can find the output diagrams that include the distribution of vertical stress (v), radial stress (r), tangential stress () and radial displacement (ur) along the distance ratio (r/R), and the input data that contain Tunnel excavation radius, R (m); Depth of tunnel crown, h (m); In-situ stress ratio, Ko; Unit weight, g (MPa/m); Elastic modulus, E (MPa); Poisson's ratio, ; Internal friction angle,  (deg.); Dilation angle,  (deg.); Cohesion, c (MPa); Clockwise angle in polar coordinate , (deg.); and Confinement loss,  .

创建时间:
2019-08-19
二维码
社区交流群
二维码
科研交流群
商业服务