Table 8 - 1 in 21 - MSK-JOR-ENV - Preliminary Risks Assessment and ESIA for the Aqaba-Amman Water Desalination and Conveyance (AAWDC) Project (Jordan) - Renewable Energy Component
收藏资源简介:
Table 8-1: ESHS Objectives and Targets for the AAWDC Project R.n.ObjectiveTargetTarget Date1.Prevent or minimise to insignificant levels any pollution to surface water, groundwater, air, and soil receptorsProvisions of appropriate pollution prevention measures to all Project related sites during construction and operation and detailed in the Construction and Operation ESMPsEnd of each calendar year throughout the Project’s contract duration2.Prevent or minimise to insignificant levels any impacts/disruptions to existing utilities, and community livelihood and mobilityAppropriate socioeconomic impacts mitigation measures to all Project related sites during construction and operation and detailed in the Construction and Operation ESMPsEnd of each calendar year throughout the Project’s contract duration3.Avoid environmental non-conformancesAppropriate environmental monitoring and reporting to all Project related sites during construction and operation and detailed in the Construction and Operation ESMPsEnd of each calendar year throughout the Project’s contract duration4.Develop and implement hazardous materials and waste management proceduresAppropriate hazardous materials and waste management procedures in place to all Project related sites during construction and operation and detailed in the Construction and Operation ESMPsEnd of each calendar year throughout the Project’s contract duration5.Develop and implement emergency response proceduresAppropriate emergency response procedures in place to all Project related sites during construction and operation and detailed in the Construction and Operation ESMPsAccording to milestones set out the approved Construction and Operation ESMPs6.Develop and implement social engagement proceduresAppropriate social engagement procedures and related grievance mechanism in place to all Project related sites during construction and operation and detailed in the Construction and Operation ESMPsEnd of each calendar year throughout the Project’s contract duration7.Provide ESHS trainingProject BOT Contractor provides ESHS training based on his approved Construction and Operation ESMPsAccording to milestones set out the approved Construction and Operation ESMPs8.Conduct Risk AssessmentsRisk Assessments (RAs) are done for each Project related construction site during construction and to each Project site during operationRA conduct and review according to the Project contract implementation schedule and approved Construction and Operation ESMPs comprising Health and Safety (H&S) Management Plans8.Avoid fatalityZero fatalities to all Project related sites throughout the Project’s contract duration (construction and operation)End of each calendar year throughout the Project’s contract duration9.Prevent falls from heightsUse inspected, fit for purpose scaffolds Encourage the use of safety harnesses throughout the Project lifespanEnd of each calendar year throughout the Project’s contract duration10.Minimise lost time injuriesLost time injuries: Maximum of 1 lost time injury per Project related site at the end of each calendar year during construction and operationEnd of each calendar year throughout the Project’s contract duration11.Minimise minor injuriesMaximum of 3 minor injuries per Project related site at the end of each calendar year during construction and operation throughout the Project lifespanEnd of each calendar year throughout the Project’s contract duration12.Minimise near missesMaximum of 4 near misses per Project related site at the end of each calendar year during construction and operation throughout the Project lifespanEnd of each calendar year throughout the Project’s contract duration