St. Clair River 2007 Hydrographic Survey
收藏Mendeley Data2024-05-17 更新2024-06-27 收录
下载链接:
https://zenodo.org/records/10276914
下载链接
链接失效反馈官方服务:
资源简介:
First multibeam hydrographic survey of the entire main stem of St. Clair River. 2007 Bathymetry data was collected by the US Army Corps of Engineers, Detroit District Algonac Junction Buoy to Fort Gratiot Lt. Data were averaged into 5' x 5' grids, center placed, with limited area of 2' x 2' grid. Data were collected with a hydrographic survey system onboard the S/V WHEELER comprised of: 1) a Reson 8125 multi-beam at 455 kHz with a .5 degree beam width 2) a velocity profiler 3) GPS/POS MV positioning and heave, pitch and roll compensation This survey data set meets the requirements of EM 1110-2-1003 1 Jan 02 Projection for all files and coordinates is NAD 83 Michigan State Plane South meters. All depths, datums and elevations are in meters. Elevations referenced to IGLD 85. X Y Z Datum Elevation x-coordinate Michigan State Plane South Meters y-coordinate Michigan State Plane South Meters z - depth, meters, relative to low water datum Datum - Low Water Datum for point Elevation - bottom elevation of river, meters, relative to IGLD85
创建时间:
2023-12-09



