Table 9 - 1 in Saidabad Water Treatment Plant Project, Phase III

收藏
Zenodo2025-12-28 更新2026-05-26 收录
官方服务:

资源简介:

Table 9-1: Different Options wise Raw Water Transmission Route Length (Original Table 41) OptionsCommon length from Haria Intake to Demra circle for all phases (km)Additional length from Demra circle to SWTPTotal length from Haria Intake to SWTPTotal length of pipelines for PhaseI, II & III (km)Transmission Main for Phase-I & II (km)Transmission Main for Phase-III (km)Transmission Main for Phase-I & II (km)Transmission Main for Phase-III (km)Option 119.23.955.4923.1524.6947.84Option 219.205.4919.224.6943.89Option 319.23.956.04523.1525.2548.40Option 419.24.786.04523.9825.2549.23Option 519.206.04519.225.2544.45