five

Utah FORGE: Wells 16A(78)-32 and 16B(78)-32 Circulation Test Daily Reports from August 2024

收藏
OpenEI2026-03-14 收录
下载链接:
https://data.openei.org/submissions/7739
下载链接
链接失效反馈
官方服务:
资源简介:
These are the daily reports created during and around the August 2024 circulation test done on wells 16A(78)-32 and 16B(78)-32 at the Utah FORGE site. Information about the rig activity during this period includes details on rig up, depths, pumping, water temperature, safety, and ...
二维码
社区交流群
二维码
科研交流群
商业服务