In flexible job shop scheduling problem (FJSP), the collision of bidirectional rail guided vehicles (RGVs) directly affects RGVs scheduling, and it is closely coupled with the allocation of production
Sizeable differences between OLS (Ordinary Least Squares) and IV (Instrumental Variables) estimates might be interpreted in the literature as evidence that the instrument is not valid. Yet, to the bes