Electricity transmission line from Bayswater Power Station to Mount Piper Power Station :
收藏Research Data Australia2025-12-20 收录
官方服务:
资源简介:
This statement examines the environmental impacts associated with the proposed construction of a 500 kV transmission line required to carry the bulk of the power generated at Bayswater Power Station to Mount Piper Power Station.
提供机构:
data.nsw.gov.au


