遇见数据集

Table- 1. The list of the firefighting facilities are summarized in the following table in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ

收藏
Zenodo2025-11-27 更新2026-05-26 收录
官方服务:

资源简介:

Table-1. The list of the firefighting facilities are summarized in the following table Sl no.Name of the firefighting equipment and facilitiesCapacityQuantityLast date of testChemicals and Sand1 2 3 4 5 6 7 8 9 10Dry Chemical Powder Dry Chemical Powder Dry Chemical Powder Dry Chemical Powder Carbondioxide (CO 2) Carbondioxide (CO 2) Carbondioxide (CO 2) Foam type Water Bucket Sand Bucket50 Kg 15 8 5 40 Liters 5 3 812 11 39 45 12 24 28 22 8 805/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010Fire Hydrant point11Main Building Stair case area of0605/01/201012210 MW Power plant office Main Building 0-meter area of1005/01/201013210 MW Power plant office Main Building Boiler House area0405/01/201014of 210 MW Power plant office Main Building 12 & 18 meters area1505/01/201015 16 17 18 19 20of 210 MW Power plant office Water treatment plant Hydrogen Plant Workshop Building Oil Refinery Plant PM Warehouse Project area (outside building)06 02 07 05 15 2305/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010 05/01/2010sub total9321Fire hose pipe (30 meters each)6505/01/2010

提供机构:
World Bank (WB)
创建时间:
2025-11-27
二维码
社区交流群
二维码
科研交流群
商业服务