Table 11 - 5 in Saidabad Water Treatment Plant Project, Phase III
收藏资源简介:
Table 11-5 Environmental (air quality and noise level) and Socio-economic monitoring during construction phase (Original Table 45) Parameters/ItemsMonitoring FrequencyResource Required and ResponsibilityCommentParticulate Matter (PM10, PM2.5)Once every 3 months, and as directed by the PDPM10 and PM2.5 measuring equipment.Results to be verified by the Environmental Expert of DSC Team.Contractor’s responsibilityNoise LevelOnce every month, and as directed by the PDNoise level meter. Contractor’s responsibilitySurface Water Quality (pH, Turbidity, BOD, COD, TDS, DO, Ammonia (NH3-N) and Oil & Grease) of Kajla KhalOnce every Quarter and as directed by PDFrom Accredited Laboratory; Contractor’s responsibilityEmployment of workforceOnce every Quarter and as directed by PDContractor’s responsibility, Supervised by the Design Supervision ConsultantCommunity Health and SafetyOnce every Quarter and as directed by PDContractor’s responsibility, Supervised by the Design Supervision ConsultantSurveys and interviews with local residents and businessesOnce in a year as directed by PDContractor’s responsibility, Supervised by the Design Supervision Consultant Note: Actual monitoring time and location will be decided by DWASA and the Design Supervision Consultant (DSC) and included in the Employer’s Requirements