遇见数据集

Buffalo - Preliminary Testing on Lined DI Pipe

收藏
DataCite Commons2020-08-02 更新2025-04-16 收录
官方服务:

资源简介:

Preliminary testing was conducted to find the force at which the IMain liner deboded from the ductile iron pipe or the force at which the IMain liner fractured while remaining bonded to the pipe.

创建时间:
2012-12-06
二维码
社区交流群
二维码
科研交流群
商业服务