five

CERP - Aquifer Storage and Recovery Regional Study-PROJ 44

收藏
DataONE2022-12-20 更新2024-06-08 收录
下载链接:
https://search.dataone.org/view/urn:uuid:c2916551-aa8d-4d91-8e97-f3fb7f0cc6a1
下载链接
链接失效反馈
官方服务:
资源简介:
In April 1999, the Comprehensive Everglades Restoration Plan (CERP) proposed large-scale development of Aquifer Storage and Recovery (ASR) facilities as the preferred method of providing additional freshwater storage required for overall restoration success. Six ASR components will collectively form the proposed CERP ASR System, which includes a total of 333 ASR wells and related surface facilities at the general locations in attached Figure A. All proposed ASR wells have a target capacity of 5 mgd (million gallons per day). Water treatment facilities were also included in the conceptual CERP ASR components. Total cost of the proposed CERP ASR System is approximately $1,700,000,000. The United States Army Corps of Engineers (USACE), Jacksonville District and the South Florida Water Management District (SFWMD) are 50/50 cost sharing partners for design studies required prior to implementation of any large-scale CERP ASR facilities.
创建时间:
2022-12-20
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作