DC fast charging stations that do not meet NEVI but within 1-mile of a corridor March 2024
收藏data.gov2025-12-20 收录
数据链接:
官方服务:
资源简介:
Locations of DC fast charging stations that do not meet NEVI power-level or port count requirements (as of March 2024) but are within 1-mile of a corridor.A data...
本数据集涵盖截至2024年3月,不符合国家电动汽车基础设施计划(National Electric Vehicle Infrastructure,简称NEVI)功率等级与接口数量要求的直流快充充电站(DC fast charging stations)点位,且此类充电站均位于某走廊沿线1英里范围内。
提供机构:
State of California


