five

Construction industry; productive hours in construction of buildings

收藏
data.overheid.nl2025-03-25 收录
下载链接:
https://data.overheid.nl/en/dataset/4136-construction-industry--productive-hours-in--non--residential-buildings
下载链接
链接失效反馈
官方服务:
资源简介:
These tables show quarterly data of the number of productive hours per employee in the construction of buildings. The number of productive hours is calculated by reducing the number of theoretically available hours with the number of non-productive hours due to holidays, sickness absence, strikes, frost and precipitation delays, etc. All figures are rounded off to the nearest 5 hours. Data available from: 1st quarter of 1990. Status of the figures: The data of all quarters are definite. Changes as of October 31, 2024: The figures of the third quarter of 2024 have been added. When will new figures be published? Statistics Netherlands usually publishes the first results within five weeks after the reporting period. After the definitive figures are published Statistics Netherlands only adapts the results if large adjustments or corrections are necessary.

本表格展示了建筑行业每名员工季度生产时长的数据。生产时长的计算方法为从理论上可用的工时中扣除因节假日、病假、罢工、霜冻及降水延误等非生产性时长的总和。所有数据均已四舍五入至最接近的5小时。数据可追溯至1990年第一季度。 数据状况:所有季度的数据均属确定。 截至2024年10月31日的变化:已新增2024年第三季度的数据。 新数据的发布时间:荷兰统计局通常在报告期结束后五周内发布初步结果。在最终数据公布后,荷兰统计局仅在需要进行重大调整或更正时才会对结果进行调整。
提供机构:
data.overheid.nl
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作