PIE LTER year 2014, 15 minute measurements of conductivity, water temperature in a small headwater stream draining draining a mainly forested catchment (55% forest + 19% wetland), Cart Cr., Newbury, MA.
收藏DataONE2018-02-19 更新2024-06-25 收录
下载链接:
https://search.dataone.org/view/https://pasta.lternet.edu/package/metadata/eml/knb-lter-pie/435/1
下载链接
链接失效反馈官方服务:
资源简介:
Year 2014, continuous measurements every 15 minutes were made of conductivity, water temperature in Cart Creek, Newbury, MA, a small headwater stream draining a mainly forested catchment (55% forest + 19% wetland) in the Parker River watershed.
创建时间:
2018-02-19



