five

Surveys at Mawson November 2018

收藏
Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/surveys-mawson-november-2018/1385725
下载链接
链接失效反馈
官方服务:
资源简介:
The Australian Antarctic Division's Infrastructure Project 5135 required terrestrial surveys at Mawson to inform decision making about mooring bollard locations. The surveying was done by LCPL Brad Smart and LCPL Mathew Van Rees Hoets of the Australian Defence Force from 11 to 21 November 2018. The data will be used in conjunction with hydrographic survey data collected in early 2019 by the Australian Hydrographic Service.Some features were also surveyed for the Australian Antarctic Division's Infrastructure section:(i) the optical fibre cable conduit above and below ground between the ANARESAT equipment building and the Workshop; (ii) the waste treatment plant and the infrastructure and terrain to the north-west of the plant.The final survey data is in 12da and dwg formats. Raw data is included.Details about the survey are given in a survey report.
提供机构:
Australian Antarctic Division
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作