Namoi Environmental Impact Statements - Mine footprints
收藏Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/namoi-environmental-impact-mine-footprints/2993728
下载链接
链接失效反馈官方服务:
资源简介:
## **Abstract** \n\nThis dataset was compiled by the Bioregional Assessment Programme from a range of sources listed in the History field of this metadata statement. \n\n\n\nMine footprint information is required to determine the mine areas that affect surface water runoff for use in the Namoi surface water modelling. These mine footprints results in changes in natural surface runoff through interception preventing its entry to the natural stream network. The footprints includes the entire area disturbed by coal mine operations, including mine pits, roads, spoil dumps, water storages and infrastructure. It may also include otherwise undisturbed parts of the landscape from which natural runoff is drained into mine-disturbed areas or retained in reservoirs. As new parts of the mine lease areas are opened up and rehabilitated areas established, the footprint changes over the life of a mine's operation.\n\n\n\nThis dataset includes the references to Environmental Impact Statements and other relevant documents from which mine footprint information are extracted for the individual mines. Folders for each of the mine projects contain copies of the pages that were digitised.\n\n## **Purpose** \n\nThis information was collated to allow for the mine footprints to be digitised (see Lineage - Dataset that use this data as input).\n\n## **Dataset History** \n\nThe sources documents for each of the extracted footprints are as follows:\n\n\n\nHansen Bailey Environmental Consultants (2010) Continuation of Boggabri Coal Mine: environmental assessment. Prepared by Hansen Bailey Environmental Consultants for Boggabri Coal Pty Limited. Viewed 09 August 2016, https://idemitsu.com.au/uploads/files/bcenviro/Boggabri_Coal_EA/Boggabri_Coal_EA_Main_Volume_Part_1.pdf.\n\n\n\nMaules Creek - Figures 9-13\n\nHansen Bailey Environmental Consultants (2011) Maules Creek Coal Project, environmental assessment statement, Section 3 the project. Prepared by Hansen Baily Environmental Consultants for Aston Coal 2 Pty Limited. Viewed 09 August 2016, https://www.whitehavencoal.com.au/environment/docs/ea-main-volume-part-1.pdf. \n\n\n\nWatermark - Figures 4.1-4.7\n\nWRM Water & Environment Pty Ltd (2013) Shenhua Watermark Project, environmental impact statement, Appendix S, surface water impact assessment. Prepared by WRM Water & Environment Pty Ltd as commissioned by Hansen Baily Environmental Consultants on behalf of Shenhua Watermark Coal Pty Limited. Viewed 09 August 2016, https://majorprojects.affinitylive.com/public/f37282787960f34d67369c3c8633cd03/20.%20Watermark%20Coal%20Project%20EIS%20-%20Appendix%20S%20-%20Surface%20Water%20Impact%20Assessment.pdf.\n\n\n\nWatermark - Figure 9\n\nHansen Bailey Environmental Consultants (2013) Watermark Coal Project, environmental impact statement. Prepared by Hansen Bailey Environmental Consultants for Shenhua Watermark Coal Pty Limited. Viewed 09 August 2016, https://majorprojects.affinitylive.com/public/a86af1422205f18302ef3aafb59cb191/01.%20Watermark%20Coal%20Project%20EIS%20-%20Main%20Report.pdf.\n\n\n\nVickery - Figures 2.4 - 2.7\n\nResource Strategies Pty Ltd (2013) Vickery Coal Project: environmental impact statement. Prepared by Resource Strategies Pty Ltd for Whitehaven Coal Limited. Viewed 08 August 2016, http://www.whitehavencoal.com.au/environment/docs/section-2-project-description.pdf.\n\n\n\nSunnyside - Figure 2.11\n\nOlsen Environmental Consulting Pty Limited (2008) Sunnyside Coal Project, via Gunnedah, environmental assessment. Report no 675/01, Section 2: description of the project. Prepared by Olsen Environmental Consulting Pty Limited in conjunction with RW Corkery & Co Pty Limited on behalf of Namoi Mining Pty Ltd. Viewed 08 August 2016, http://www.whitehavencoal.com.au/environment/docs/section-2-description-of-the-project.pdf.\n\n\n\nWerris Creek - Figure 2.1 and Figures 2.8 - 2.11\n\nRW Corkery & Co Pty Limited (2010) Werris Creek Coal Mine: Section 2 project description. Prepared by RW Corkery & Co Pty Limited for Werris Creek Coal Pty Limited. Viewed 09 August 2016, http://www.whitehavencoal.com.au/environment/docs/02152402-section-2-project-description.pdf.\n\n\n\nRocglen - Figure 15 and Figures 17-20\n\nGSS Environmental (2011) Rocglen Coal Mine extension project, Project Approval 10_0015, environmental assessment Section 5 project description. Prepared by GSS Environmental on behalf of Whitehaven Coal Limited. Viewed 09 August 2016, https://www.whitehavencoal.com.au/environment/docs/section-5-project-description-part-1.pdf .\n\nhttps://www.whitehavencoal.com.au/environment/docs/section-5-project-description-part-2.pdf.\n\nhttps://www.whitehavencoal.com.au/environment/docs/section-5-project-description-part-3.pdf.\n\n\n\nTarrawonga Figures 2.4-2.8\n\nResource Strategies Pty Ltd (2012) Tarrawonga Coal Project, environmental assessment, Section 2 project description. Prepared by Resource Strategies Pty Ltd for Tarrawonga Coal Pty Ltd. Viewed 09 August 2016, https://www.whitehavencoal.com.au/environment/tarrawonga_mine_environmental_management.cfm.\n\n\n\nCaroona - Figure 4\n\nBHP Billiton (2014) Caroona Coal Project: project description and preliminary environmental assessment. Viewed 09 August 2016, http://www.bhpbilliton.com/\\~/media/bhp/documents/society/regulatory/_coal/nswec/caroona-coal-project/140430_coal_nswec_caroona_projectdescriptionandpreliminaryenvironmentalassessment.pdf?la=en.\n\n\n\nNarrabri North - Figure 2.1\n\nRW Corkery & Co Pty Limited (2009) Environmental assessment for the Narrabri Coal Mine Stage 2 longwall project, Section 2 - description of the project. Report No. 674/16. Prepared by RW Corkery & Co Pty Limited for Narrabri Coal Operations Pty Ltd. Viewed 09 August 2016, http://www.whitehavencoal.com.au/environment/docs/section-2-description-of-the-longwall-project.pdf.\n\n\n\nNarrabri South - figure, pg 15\n\nWhitehaven Coal Limited (2015) Narrabri North Mine/Narrabri South Project - resources and reserve. Viewed 08 August 2016, http://www.whitehavencoal.com.au/investors/docs/narrabri-underground13100956.pdf.\n\n## **Dataset Citation** \n\nBioregional Assessment Programme (2017) Namoi Environmental Impact Statements - Mine footprints. Bioregional Assessment Source Dataset. Viewed 12 March 2019, http://data.bioregionalassessments.gov.au/dataset/493a47cd-4228-4dec-bb72-bcf4495fa306.
提供机构:
data.gov.au



