Data for: Construction Time, Cost and Testing Data of a Prefabricated Isolation Medical Unit for COVID-19
收藏Mendeley Data2021-04-26 更新2026-04-09 收录
下载链接:
https://data.mendeley.com/datasets/7t22d8dmn6
下载链接
链接失效反馈官方服务:
资源简介:
The data presented have been gathered under the construction of a high cleanness negative pressure prefabricated isolation medical unit constructed for COVID-19 patients located at Pingshan People’s Hospital, Shenzhen, China. Under this project, this medical unit was constructed within five working days via prefabricated modular construction. The collected installation cost data were categorized as various major components, including the container, windows & doors, sanitation, indoor equipment, heating, ventilation and air conditioning. All the costs listed are in CNY (Chinese Yuan).