资源简介:
EX1205 Leg 2 operations are expected to commence on July 28, 2012 at Morehead City, NC and conclude on August 3, 2012 at Davisville, RI. The planned transit line is 1350 nautical miles and is expected to take 6.3 days at an average speed of 9 knots (figure 1). Multibeam and single beam mapping operations will be conducted 24 hours a day during the transit. Sub bottom profile mapping will be conducted between the hours of 1000 and 1800 during the transit. 2012 Ocean Exploration Program OAR (Oceanic and Atmospheric Research) Submitted https://doi.org/10.25923/9z96-z303 Public Domain 1878