Proposed bus turnaround facility, Westmead Precinct, Northwest Transitways: review of environmental factors
收藏Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/proposed-bus-turnaround-environmental-factors/1759182
下载链接
链接失效反馈官方服务:
资源简介:
The New South Wales Roads and Traffic Authority (RTA) proposes to construct a bus turnaround facility off Darcy Road in the Westmead precinct of the Northwest Transitways. The RTA, in partnership with the Ministry of Transport (MoT) is constructing and operating the North-West Transitway Network, consisting of two integrated rapid bus links: Parramatta — Rouse Hill Link and Blacktown — Castle Hill Link. The Transitway consists of new bus only roadways and the creation of dedicated bus lanes on existing roads. The Parramatta — Rouse Hill Link will be approximately 17 kilometres (km) long and include 19 Transitway stations. The Blacktown — Castle Hill Link will be approximately 15 km long and include 21 Transitway stations (including Burns interchange).
提供机构:
data.nsw.gov.au



