遇见数据集

FCR second test Testing protocol frequency or power profile

收藏
Zenodo2020-06-29 更新2026-05-25 收录
数据链接:
官方服务:

资源简介:

Data files for performing FCR second test Testing protocol as described in annex B of QualyGridS publication "Finalized testing protocol" DOI: https://doi.org/10.5281/zenodo.3912063. Based on real grid Frequency profile from Fingrid. Files FCR_Secondtest_Frequency_... contain the grid frequency input for the test with each line a frequency value in 0.1 second steps, total duration 4 hours. File FCR_secondtest:Power… contain the power vs. time profile derived from the grid frequency profile for a range of 0-100% with 0% being the lowest power to be used in the test and 100% the highest power. The file contain the power percentage with each line a percentage value in 0.1 second steps, total duration 4 hours. Further explanations in QualyGridS publication "Finalized testing protocol" https://doi.org/10.5281/zenodo.3912063

提供机构:
Zenodo
创建时间:
2020-06-29
二维码
社区交流群
二维码
科研交流群
商业服务