five

Yuma Wall Stabilization, Yuma Territorial State Prison, Arizona

收藏
DataONE2016-03-01 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV8HQ41RW_meta$v=1456858159777
下载链接
链接失效反馈
官方服务:
资源简介:
The State Parks Board and department personnel have expressed the desirablility of developing a wall finish over the existing caliche material that could achieve the texture and color of the original white plaster used in the early 1900s. Previous work with cast-in-place concrete on a similar wall in the New Yard area was completed at a cost of $25.00 to $32.00 per square foot of wall face. A built-up roof frame was also considered in this report. Due to the natural appearance of the other cell blocks and the buildings in the complex, it would not seem appropriate to scar the natural setting of the cellblock hill with any large protective overhang.
创建时间:
2016-03-01
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作