five

Monitored soil settlement induced by shield tunneling construction

收藏
DataONE2021-10-19 更新2024-06-08 收录
下载链接:
https://search.dataone.org/view/sha256:4a32090c379e6a3f55b3b56e5e4e22ceae06e977f8dbf9ccd7652278ee6a83af
下载链接
链接失效反馈
官方服务:
资源简介:
This dataset provides the monitored soil settlement of a monitoring section induced by shield tunneling construction. The Excel file named “Settlement time history” contains the time history of six monitoring points with a time interval of 1 hour from 20 March 2019 to 23 September 2019. The Word file named “Explanation of settlement data” illustrates the layout of monitoring sensors and the way for installation of the monitoring points.
创建时间:
2023-11-13
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作