Electricity Installed Capacity (Peak Load) by Region
收藏datasource.kapsarc.org2024-02-26 更新2025-01-22 收录
下载链接:
https://datasource.kapsarc.org/explore/dataset/installed-generation-capacity-peak-load-in-mw-by-region-for-2014/
下载链接
链接失效反馈官方服务:
资源简介:
This dataset contains Saudi Arabia Electricity Installed Capacity (Peak Load) by region for 2004 - 2019. Data from Electricity and Cogeneration Regulatory Authority. Follow datasource.kapsarc.org for timely data to advance energy economics research.Citation: "Installed Generation Capacity (Peak Load) In MW By Region For 2014". ECRA. N.p., 2014. Web. 10 Mar. 2016.* 1 GW = 1000 MWThe Electricity andCogeneration Regulatory Authority (ECRA) website has changed to Water & ElectricityRegulatory Authority (WERA).Thisdataset was extracted from ECRA’s website and has been discontinued, to access WERA’s datasets pleasefind the following link
本数据集收录了2004年至2019年间沙特阿拉伯各地区电力装机容量(峰值负荷)数据,数据来源于电力及联合发电监管局。欲获取最新数据以推进能源经济学研究,请访问datasource.kapsarc.org。引用信息如下:《按地区划分的装机容量(峰值负荷)概览,单位为兆瓦,2014年》ECRA,未知出版地,2014年。网络版,访问日期:2016年3月10日。* 1吉瓦(GW)等于1000兆瓦。电力及联合发电监管局(ECRA)的网站已更改为水与电力监管局(WERA)。本数据集系从ECRA网站提取,现已停止更新。如需访问WERA的数据集,请点击以下链接。
提供机构:
datasource.kapsarc.org



