The impact of overtime duration variations on labor productivity in apartment construction projects: A study on engineering and disaster management in the construction sector
收藏DataCite Commons2025-03-14 更新2025-04-15 收录
下载链接:
https://dataverse.harvard.edu/citation?persistentId=doi:10.7910/DVN/UVI4HT
下载链接
链接失效反馈官方服务:
资源简介:
Background: Construction projects, especially apartment buildings, often face challenges such as resource limitations, unpredictable weather, and schedule delays, which lead to increased costs and reduced productivity. Overtime is a commonly adopted strategy to address these issues; however, its effect on labor productivity is complex. Methods: This study investigates the impact of varying overtime durations (1, 2, and 3 hours) on labor productivity and Labour Utilization Rate (LUR) for three critical tasks: rebar installation, concrete casting, and formwork installation in the Sky House Alam Sutera project. The Productivity Rating method and LUR analysis were used to evaluate normal productivity and productivity during overtime, with data collected through direct observation, interviews, and project documentation analysis. Findings: The results reveal that while overtime increases daily output, it also reduces productivity per hour as work hours extend. Rebar installation exhibited the most significant decline in productivity, from 493.529 kg/day during regular hours to 345.470 kg/day with 3 hours of overtime. Correspondingly, the LUR improved with overtime, with rebar installation increasing from 68% under normal conditions to 72% with 3 hours of overtime. Similarly, the cost of labor increased by 9%–23% due to overtime, depending on the task and duration. Conclusion: The findings suggest that the optimal overtime duration is 1 hour, balancing productivity gains, cost efficiency, and LUR improvements, while prolonged overtime may lead to diminishing returns due to worker fatigue. This study provides insights into managing overtime in construction projects, emphasizing the importance of controlling overtime durations to achieve project objectives efficiently. By integrating LUR analysis, this research offers a comprehensive understanding of how labor utilization can be optimized alongside productivity and cost management during project acceleration. Novelty/Originality of this article: This study offers an original perspective by examining the impact of varying overtime durations on both labor productivity and Labor Utilization Rate (LUR) in the context of construction projects, using a detailed analysis of three critical tasks. The integration of LUR alongside traditional productivity metrics provides a comprehensive approach to understanding labor efficiency, cost management, and the diminishing returns of overtime, offering valuable insights for optimizing project schedules and resource allocation.
提供机构:
Harvard Dataverse
创建时间:
2025-03-14