five

Implementation timeline overview.

收藏
Figshare2025-12-11 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/Implementation_timeline_overview_/30863856
下载链接
链接失效反馈
官方服务:
资源简介:
This study evaluates the readiness of Egypt’s construction sector to integrate Circular Economy (CE) principles by identifying and analyzing the main barriers to effective Construction and Demolition Waste (CDW) management. A comprehensive survey-based methodology (n = 384) was employed to gather data from industry stakeholders, demonstrating excellent sampling adequacy (KMO = 0.961). Initially, 41 potential barriers were identified via literature review and expert consultation. Exploratory Factor Analysis (EFA) subsequently refined these to 10 critical barriers, whose interrelationships were validated using Structural Equation Modeling (SEM), exhibiting a strong model fit (RMSEA = 0.065; CFI = 0.974). The analysis revealed persistent economic, technological, and social barriers impeding CE adoption. Notable challenges include high implementation costs, inadequate technical expertise, low stakeholder awareness, and weak policy enforcement. Based on these findings, prioritized, time-phased recommendations are proposed to provide an evidence-based framework for policy and practice. This research contributes an early empirical assessment of CE adoption in Egypt’s construction sector, offering a robust roadmap for a more sustainable, resource-efficient industry aligned with national environmental and economic objectives.
创建时间:
2025-12-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作