遇见数据集

AOT Commissioning P32: FIR Mapping of CG12

收藏
ESA Earth Online2026-06-22 收录
官方服务:

资源简介:

.cob_id aotpv_p18c_000_000.naot .cob_title aot commissioning p22: fir mapping of cg12 .author g. pelz .history 15/01/96 first version rjl 20/01/96 removed the c100 maps and changed c200 dimension for rev 67. rjl/uk 21/01/96 changed the prop_id and mapdimension to fit in the schedule for rev67. removed the draco observation. 08/02/96 created the 100 micron map proposal for additional commissioning in routine phase. rjl this case is an exposure on the bright interstellar cloud cg12 to test the c100 mapping mode. the oversampling factor 2/3 for c100 is tested which could lead to an optimized performance. to he outcome will be used to verify the intrinsic noise performance of the c100/c200 detector and to verify the usage of the chopper mode. for revolution 67 we scheduled only the 160 micron map. this propopsal will yield the complementary 100 micron map. .ott .tdt truncated!, Please see actual data for full text [truncated!, Please see actual data for full text]

提供机构:
European Space Agency
二维码
社区交流群
二维码
科研交流群
商业服务