US Grid Interconnection Queue (1995-2025)
收藏数据链接:
官方服务:
资源简介:
38,058 power plant grid-connection requests, outcomes and wait times
38058条电厂并网申请(power plant grid-connection requests)及其办理结果与等待时长数据
创建时间:
2026-08-08

38,058 power plant grid-connection requests, outcomes and wait times
38058条电厂并网申请(power plant grid-connection requests)及其办理结果与等待时长数据