five

All Woody Biomass - Pelleting (Catchments)

收藏
DataCite Commons2026-04-16 更新2025-04-16 收录
下载链接:
https://api.odp.saeon.ac.za/catalog/SAEON/go/10.15493/BEA.DATA.10000027
下载链接
链接失效反馈
官方服务:
资源简介:
Technical Challenges - Existing expertise and infrastructure in respect of `Working for Water` programmes in respect of harvesting and eradication projects required for conversion to electricity. It may be simpler and less risky to generate new sources of renewable electricity rather than converting existing power stations to co-firing. Cost Challenges - There may be as many as 40 viable projects, all having a 20-year lifetime - with significant capital investment required. Policy Challenges - The projects are feasible and well aligned with existing expertise and infrastructure in respect of `Working for Water` programmes. Integration with DEA `Working for Energy` required and incorporation into IPP programmes needed. Environmental Challenges - The net impact on greenhouse gas emissions is large, despite land use change effects, given the significant reduction in GHG as CO2 equivalents in comparison to coal.
提供机构:
South African Environmental Observation Network
创建时间:
2018-03-07
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作