This digital archive comprises images, spreadsheets, reports and site records from archaeological monitoring and supervision during construction of a water pipeline linking the existing network at two
2 images. Long Beach freeway bridge dedication, 1 April 1959. Patti Caraco -- 19 years ("Miss Port of Long Beach"); Joseph Patrick Bishop (President Long Beach Harbor Commission); Mrs. Roberta Shoemak
Water intake cam | enclosing the intake with cement | not clear | Perforated pipe was buried and an intake box built at the point of the existing dam. Later this intake point was enclosed with concret