five

Projects related to improvements in study design, the reduction per study and estimated annual reduction.

收藏
Figshare2015-12-02 更新2026-04-29 收录
下载链接:
https://figshare.com/articles/dataset/_Projects_related_to_improvements_in_study_design_the_reduction_per_study_and_estimated_annual_reduction_/1115577
下载链接
链接失效反馈
官方服务:
资源简介:
NA = Not analyseda) Not possible to estimate as the routine was implemented just before the end of the investigated period.b) Not possible to estimate as the design and number of investigative studies varies a lot between years. To be evaluated after 2–3 years.
创建时间:
2015-12-02
二维码
社区交流群
二维码
科研交流群
商业服务