The NSW Government has set operational phase stormwater management targets to achieve waterway health objectives for protecting and restoring the blue-grid in the Wianamatta-South Creek catchment. The
The pilot facility is a cylindrical-shaped bioretention system with 7 m2 of surface area. It consists of the following layers: vegetated surface depression (20 cm), filter substrate (45-58 cm, sandy l