Coweeta Creek Stream Network Breakdown Phenology Model
收藏数据链接:
官方服务:
资源简介:
Using stream network models, we evaluated the effects of future climate warming; streams fed by shallow or minimal groundwater had strongly depleted leaf litter during summer, emphasizing the importance of deep groundwater thermal inputs for the stability and resilience of forest stream ecosystems. The following contains the data analysis for stream network modelling component. Details and updated versions can be found here: https://github.com/Haredkb/StreamNetwork_leafbreakdownphenology
创建时间:
2024-05-25



