CERP Site 1 Impoundment - Phase 1 Construction Turbidity Monitoring
收藏DataCite Commons2023-02-25 更新2025-04-16 收录
下载链接:
https://cerp-sfwmd.dataone.org/view/doi:10.25497/D7W889
下载链接
链接失效反馈官方服务:
资源简介:
As a condition of the construction permit, environmental monitoring during the Site 1 Impoundment Project phase 1 construction is required. It is required that contractors conduct operations in a manner that will minimize turbidity, therefor turbidity must be monitored on a daily basis throughout the construction phase of the project.
提供机构:
CERP - South Florida Water Management District
创建时间:
2022-10-06



