CERP Site 1 Impoundment - Phase 1 Construction Turbidity Monitoring
收藏官方服务:
资源简介:
As a condition of the construction permit, environmental monitoring during the Site 1 Impoundment Project phase 1 construction is required. It is required that contractors conduct operations in a manner that will minimize turbidity, therefor turbidity must be monitored on a daily basis throughout the construction phase of the project.
创建时间:
2022-10-06



