遇见数据集

CERP Site 1 Impoundment - Phase 1 Construction Turbidity Monitoring

收藏
DataCite Commons2023-02-25 更新2025-04-16 收录
官方服务:

资源简介:

As a condition of the construction permit, environmental monitoring during the Site 1 Impoundment Project phase 1 construction is required. It is required that contractors conduct operations in a manner that will minimize turbidity, therefor turbidity must be monitored on a daily basis throughout the construction phase of the project.

创建时间:
2022-10-06
二维码
社区交流群
二维码
科研交流群
商业服务