Data from: Resource level and uncertainty shape a crucial life-history trade-off in burying beetle mothers
收藏资源简介:
Dataset and R Script to replicate all analyses in "Resource level and uncertainty shape a crucial life-history trade-off in burying beetle mothers". Column names: ID: Unique ID per femaleMass: Female mass at time of carcass manipulation in gramsTreatment: Carcass manipulation treatmentF_Pronotum: Female pronotum width in mmBrood_Size_initial: number of larvae at time of carcass manipulationBrood_size_lost: number of larvae that are missing (presumed dead or eaten) at the end of the experimentF_mass_d5: Female mass at the end of the experiment in gramsF_mass_change_d5: Female mass difference between start and end of the experiment in gramsPO: Phenoloxydase activity represented by the slope of the measured reaction (VMAX)LA: Lytic activity measured as the zone of clearance diameter in mmEncaps: Encapsulation activity of the implanted nylon thread. Measurement is the difference in gray value ("greyness") between the blackened inserted thread, and the white, unimplanted control thread as measured by imageJ. Gray value in imageJ ranges from 0 to 255.



