Table E- 0 - 5 in Saidabad Water Treatment Plant Project, Phase III
收藏官方服务:
资源简介:
Table E-0-5: Different Options wise Raw Water Transmission Route Length (new table) OptionsCommon length from Haria intake to Demra Circle for all phasesAdditional length from Demra Circle to SWTP Transmissi Transmission on Main for Main for Phase-I & Phase-III IITotal length from Haria intake to SWTP Transmissi Transmissi on Main for on Main for Phase-I & Phase-III IITotal length of pipeline for Phase-I, II & III(km)(km)(km)(km)(km)(km)Option 119.23.955.4923.1524.6947.84Option 219.205.4919.224.6943.89Option 319.23.956.04523.1525.2548.4Option 419.24.786.04523.9825.2549.23Option 519.206.04519.225.2544.45