Table 8.3 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ
收藏资源简介:
Table 8.3. Monitoring activities during construction and operation phase of the project. IssueParametersMonitoring Resource Required andFrequency ResponsibilityConstruction PhaseAmbient air qualityNOX, CO, Temperature, PM10 and PM2.5 (if required)Once in every month (or as per DoE's reporting obligation)This monitoring activities will be done by the EPC contractor during contract period when EMU in EGCB will supervise.River waterWater temp., DO, BOD5, COD, Oil and Grease and heavy metalsOnce in every month if required (It is not the part of regular environmental monitoring)Monitoring at this stage is the obligation of the EPC contractor and EMU in EGCB will supervise.Drinking waterPhysical parameter: - color, turbidity, Chemical parameters: - pH, nitrate, alkalinity, total hardness, calcium hardness, arsenic, Iron (Fe), Cl, Mn, Al, arsenic, Biological parameters: - total coliform, faecal coliform,Once in every month (If the workers use drinking water from the contractors supply source)The EPC contractor will monitor the drinking water parameterSoil qualitySoil will be monitored. Agricultural soil may be tested by the SRDI.As and when is required. If any adverse report/information is foundThe EPC contractor will responsible for cleaning in case of accidental spillage and during this period EMU in EGCB will supervise.