five

Post-construction evaluation of the juvenile bypass collection channel, transportation flume, and fish-monitoring facilities at Bonneville Dam second powerhouse, 1999-2000

收藏
NOAA Institutional Repository2025-12-24 更新2026-04-25 收录
下载链接:
https://repository.library.noaa.gov/view/noaa/50192
下载链接
链接失效反馈
官方服务:
资源简介:
In 1999, we conducted an initial reconnaissance-level study to determine if the rebuilt system components provided safe juvenile passage conditions. In 2000, we completed a second, more thorough evaluation of the completed system. Major objectives of the studies were to determine detection and separation efficiencies, assess physical effects, and evaluate passage timing ofjuvenile salmonids. We conducted tests using juvenile yearling and subyearling chinook salmon Oncorhynchus tshawytscha, juvenile steelhead O. mykiss, and juvenile sockeye salmon O. nerka. Test fish were obtained directly from hatcheries or from juvenile fish-monitoring facilities (river-run test fish). Contract no. W66QKZ90281485 Contract no. W66QKZ00593474
提供机构:
NOAA
创建时间:
2025-12-24
二维码
社区交流群
二维码
科研交流群
商业服务