five

CROSSBOW HLU2-UC1-TC1 measurements: Substation measurements gathered during curtailment activation. Second test

收藏
NIAID Data Ecosystem2026-03-13 收录
下载链接:
https://zenodo.org/record/6501741
下载链接
链接失效反馈
官方服务:
资源简介:
. Capture on 21/04/2022 The data comprises the 2 sec measurements from HOPS SCADA system for for the Konjsko substation before, during and after a curtailment in Pometeno Brno plant (21:00 - 22:30 on 21/04/2022). The measurements gathered from the SCADA are: P, Q and V of the 110, 220 and 400 Kv buses at the substation P, Q and V of the line connecting the substation with the plant
创建时间:
2022-04-29
二维码
社区交流群
二维码
科研交流群
商业服务