数据链接:
官方服务:
资源简介:
A collection of vehicle data for running time estimation in YAML format.
应用场景:
创建时间:
2022-06-03
相关数据集
Creation of a Framework for Railway Timetable Optimization Criteria
During the last years, much effort has been put into developing mathematical models for timetable creation. All models need an objective function which describes criteria used to optimize and evaluate
DataCite Commons2020-08-01 更新140
Optimal Reinsertion of Cancelled Train Lines
One recovery strategy in case of a major disruption in a rail network is to cancel all trains on a specific line of the network. When the disturbance has ended, the cancelled line must be reinserted a
DataCite Commons2020-08-01 更新100
ROAM - Rail Opal Assignment Model
This dataset provides an indicator of historic rail occupancy for individual rail services from July 2019. \r\n\r\nData included in ROAM - Rail Opal Assignment Model - includes Sydney Trains (T1 - T9)
Research Data Australia60
Optimal Reinsertion of Cancelled Train Lines
One recovery strategy in case of a major disruption in a rail network is to cancel all trains on a specific line of the network. When the disturbance has ended, the cancelled line must be reinserted a
DataCite Commons2020-08-01 更新120
Fact-checking of timetabling principles: a case study on the relationship between planned headways and delays
The tradeoff between reliability and level of service is a central focus for railway operators and infrastructure managers. A well-performing timetable must include an optimal level of buffer time bet
DataCite Commons2020-08-01 更新90



