遇见数据集

Power profiles of loads, DERs and MGs' internal units

收藏
Zenodo2020-07-27 更新2026-04-07 收录
数据链接:
官方服务:

资源简介:

Dataset of power profiles used in the Simulation section of the paper Bonassi, F., La Bella, A., Lazzari, R., Sandroni, C., &amp; Scattolini, R. (2021). Supervised control of hybrid AC-DC grids for power balance restoration. <em>Electric Power Systems Research</em>, <em>196</em>, 107107. <br> Please cite the paper if you use this data. <strong>The dataset is made of the following files:</strong> 'cluster_references.xls': Table of the reference power programs of the four clusters. Column 'Cluster_i_ref': Power program of the i-th cluster [kW]<br> 'converter_schedules.xls': Table of power converters' scheduled power profiles. Column 'Converter_i_P': Active power program of the i-th power converter [kW] Column 'Converter_i_Q': Reactive power program of the i-th power converter [kVAR]<br> 'load_actual.xls': Table of the actual power profiles of the loads connected to the grid. Column 'Load_i_P': Active power absorbed by the i-th load [kW] Column 'Load_i_Q': Reactive power absorbed by the i-th load [kVAR]<br> 'load_forecasts.xls': Table of the power profiles' forecasts of the loads connected to the grid. Column 'Load_i_P': Active power forecast of the i-th load [kW] Column 'Load_i_Q': Reactive power forecast of the i-th load [kVAR]<br> 'MG_schedules.xls': Table of MGs' schedules for dispatchable units. Column 'MG_i_Gen_P': Active power schedule for the dispatchable generator of the i-th MG [kW] Column 'MG_i_Gen_Q': Reactive power schedule for the dispatchable generator of the i-th MG [kVAR] Column 'MG_i_Batt_P': Active power schedule for the battery of MG_i [kW] Column 'MG_i_Batt_Q': Reactive power schedule for the battery of MG_i [kVAR]<br> 'pv_actual.xls': Table of the actual power profiles of the PV panels. Column 'MG_i_PV_P': Active power injected by the PV panel of MG_i [kW] <br> 'pv_forecasts.xls': Table of the power profiles' forecasts of the PV panels. Column 'MG_i_PV_P': Active power forecast of the PV panel of MG_i [kW]<br> 'units_network_data.xls': Table of units' and network data. Sheet 'AC nodes': Data concerning the AC buses. Sheet 'AC branches': Data concerning the AC branches connecting the AC nodes. Sheet 'AC-DC interfaces': Data of the AC-DC interfacing power converters. Sheet 'DC links': Data concerning the DC links. Sheet 'MGs Generators': Nominal data of MGs' internal generators. Sheet 'MGs Batteries': Nominal data of MGs' internal batteries.

创建时间:
2020-07-27
二维码
社区交流群
二维码
科研交流群
商业服务