CROSSBOW TC_01.05.01 final demonstration results
收藏资源简介:
This data set represents final demonstration results for the Test Case 5.1 from the High Level Use case 1 of the CROSSBOW project. It contains lists of Critical Network Element & Contingency (CNEC) pairs for 17 SEE borders (AL-GR, AL-RS, BA-HR, BA-ME, BA-RS, BG-GR, BG-MK, BG-RO, BG-RS, BG-TR, GR-ALMKBGTR, ME-AL, ME-RS, RS-BAHR, RS-BGRO, RS-HU, RS-MEMKAL) and 4 seasons (spring, summer, autumn and winter), which are used as input data for Net Transmission Capacity (NTC) calculation. For each CNEC pair in the list, Outage Transmission Distribution Factor (OTDF) is presented. Selection of CNEC pairs is determined based on predefined criteria (OTDF>20%) , using algorithm presented in CROSSBOW deliverable: D4.2 CROSSBOW Regional Operation Centre Balancing Cockpit (ROC-BC).




