Table B- 1 in ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF WORLD BANK FINANCED SIDDHIRGANJ 450 MW COMBINED CYCLE POWER PLANT (CCPP) PROJECT SIDDHIRGANJ, NARAYANGAJ

收藏
Zenodo2025-11-27 更新2026-05-26 收录
官方服务:

资源简介:

Table B-1 Suggested Key EHS Elements for EA of New Thermal Power Project Analysis of•Fuel selection including non-fossil fuelAlternativesoptions (coal, oil, gas, biomass, otherrenewable options – wind, solar,geothermal, hydro), fuel supply sources•Power generation technologyo Thermal generating efficiency(HHV-gross, LHV-gross,HHV-net, LHV-net)o Costo CO2 emissions performance(gCO2/kWh)•GHG emissions reduction / offsetoptionso Energy conversion efficiencyo Offset arrangemento Use of renewable energysources, etc.•Baseline water quality of receiving waterbodies•Water supplyo Surface water, undergroundwater, desalination•Cooling systemo Once-through, wet closedcircuit, dry closed circuit•Ash disposal system - wet disposal vs.