Survey Report, Antarctic Surveys 1983-84 Summer Season by B.M.Fitzgerald, Australian Survey Office, Victoria Office
收藏资源简介:
Survey party: Bryan Fitzgerald, Athol Warman and Pat Dosser. Tasks carried out at Casey: survey of proposed wharf site along the north side of Budnick Island; soundings in Newcomb Bay; skyline surveys at proposed navigational aids sites at Lanyon Junction and Bailey Peninsula. Tasks carried out at Davis: detail surveys of proposed runway sites; selection, marking and measurement of photo control points; selection of a suitable route for an aerodrome access road; aerial photography; various survey tasks for National Mapping, the Australian Antarctic Division and the Department of Housing and Construction. Tasks carried out at Mawson: site inspection of the proposed aerodrome at Rumdoodle; control marks at Mawson; a survey of the proposed site of the store at Mawson.



