遇见数据集

Year 2013, 15 minute measurements of stage, water temperature in a small headwater stream draining a mainly wetland catchment (49% wetlands/swamp + 36% forest), Bear Meadow Brook, draining Cedar Swamp, Reading, MA.

收藏
官方服务:

资源简介:

Year 2013, continuous measurements, every 15 minutes, were made of stage and water temperature in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.

二维码
社区交流群
二维码
科研交流群
商业服务